
Gannon Building (GB)
422 North Washington Square
Lansing, Michigan 48933
Construction of the Gannon Vocational-Technical Center was completed in 1975. (The physical education portion of the building and the parking ramp were finished a year later.) It is named in honor of the college's first president, Philip J. Gannon, and is currently referred to as the Gannon Building. This change was made as a result of the vocational and technical programs that originally operated in the building being moved to West Campus in 2004-2005. The building serves as a "one-stop" source for student services at the college.

